1. What tool is commonly used to develop a project schedule?
Gantt Chart
Risk Register
Stakeholder Analysis
Project Charter
Show Answer
✅ Correct Answer: Gantt Chart
2. What is the purpose of a Critical Path Method (CPM)?
Identify the longest sequence of dependent tasks
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Identify the longest sequence of dependent tasks
3. Which technique is used to estimate activity durations?
Three-Point Estimating
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Three-Point Estimating
4. What is the purpose of a Milestone Chart?
Track key project milestones
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Track key project milestones
5. Which technique is used to compress a project schedule?
Crashing
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Crashing
6. What is the purpose of a Schedule Baseline?
Track project progress against the original schedule
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Track project progress against the original schedule
7. Which technique is used to identify schedule dependencies?
Precedence Diagramming Method (PDM)
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Precedence Diagramming Method (PDM)
8. What is the purpose of a Schedule Network Analysis?
Identify the critical path and schedule flexibility
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Identify the critical path and schedule flexibility
9. Which technique is used to allocate resources to project tasks?
Resource Leveling
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Resource Leveling
10. What is the purpose of a Schedule Performance Index (SPI)?
Measure schedule efficiency
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Measure schedule efficiency
11. Which technique is used to identify schedule risks?
What-If Scenario Analysis
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: What-If Scenario Analysis
12. What is the purpose of a Schedule Variance (SV)?
Measure the difference between planned and actual progress
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Measure the difference between planned and actual progress
13. Which technique is used to optimize the project schedule?
Schedule Compression
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Schedule Compression
14. What is the purpose of a Schedule Management Plan?
Define how the project schedule will be managed
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Define how the project schedule will be managed
15. Which technique is used to estimate activity resources?
Resource Breakdown Structure (RBS)
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Resource Breakdown Structure (RBS)
16. What is the purpose of a Schedule Forecast?
Predict future schedule performance
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Predict future schedule performance
17. Which technique is used to identify schedule constraints?
Constraint Analysis
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Constraint Analysis
18. What is the purpose of a Schedule Update?
Reflect changes in the project schedule
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Reflect changes in the project schedule
19. Which technique is used to visualize project schedules?
Gantt Chart
Risk Register
Stakeholder Analysis
Project Charter
Show Answer
✅ Correct Answer: Gantt Chart
20. What is the purpose of a Schedule Baseline?
Track project progress against the original schedule
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Track project progress against the original schedule
21. What is the primary purpose of a Work Breakdown Structure (WBS) in scheduling?
Define scope baseline for scheduling
Track project costs
Identify stakeholders
Manage project risks
Show Answer
✅ Correct Answer: Define scope baseline for scheduling
22. Which technique is used to calculate float in a schedule network?
Critical Path Method
Gantt Chart
Resource Leveling
Earned Value Analysis
Show Answer
✅ Correct Answer: Critical Path Method
23. What does Total Float represent in schedule management?
Maximum delay without affecting project end date
Total project duration
Sum of all activity durations
Critical path duration
Show Answer
✅ Correct Answer: Maximum delay without affecting project end date
24. Which relationship type is most common in Precedence Diagramming Method?
Finish-to-Start
Start-to-Start
Finish-to-Finish
Start-to-Finish
Show Answer
✅ Correct Answer: Finish-to-Start
25. What is the purpose of a Schedule Network Diagram?
Visualize task dependencies and paths
Track resource allocation
Monitor project costs
Identify project risks
Show Answer
✅ Correct Answer: Visualize task dependencies and paths
26. Which technique helps resolve resource overallocation?
Resource Leveling
Fast Tracking
Crashing
Critical Chain Method
Show Answer
✅ Correct Answer: Resource Leveling
27. What is the key benefit of using Monte Carlo simulation in scheduling?
Quantify schedule uncertainty
Reduce project duration
Eliminate critical path
Automate schedule updates
Show Answer
✅ Correct Answer: Quantify schedule uncertainty
28. Which schedule compression technique adds more resources?
Crashing
Fast Tracking
Resource Smoothing
Critical Chain
Show Answer
✅ Correct Answer: Crashing
29. What is the primary output of Define Activities process?
Activity List
Schedule Baseline
Milestone Chart
Project Calendar
Show Answer
✅ Correct Answer: Activity List
30. Which technique is used to determine activity sequences?
Precedence Diagramming Method
Critical Path Method
Earned Value Management
Resource Leveling
Show Answer
✅ Correct Answer: Precedence Diagramming Method
31. What is the purpose of a Rolling Wave Planning?
Progressive elaboration of near-term work
Compress project schedule
Level resources
Calculate float
Show Answer
✅ Correct Answer: Progressive elaboration of near-term work
32. Which document defines working hours and holidays for scheduling?
Project Calendar
Schedule Baseline
WBS
Network Diagram
Show Answer
✅ Correct Answer: Project Calendar
33. What is the key difference between Free Float and Total Float?
Free Float doesn't affect successor activities
Total Float is always zero
Free Float applies only to critical path
Total Float includes project buffer
Show Answer
✅ Correct Answer: Free Float doesn't affect successor activities
34. Which technique uses buffers to protect the schedule?
Critical Chain Method
Critical Path Method
Fast Tracking
Resource Leveling
Show Answer
✅ Correct Answer: Critical Chain Method
35. What is the purpose of a Schedule Data Review?
Validate schedule integrity
Compress schedule
Update WBS
Reassign resources
Show Answer
✅ Correct Answer: Validate schedule integrity
36. Which technique analyzes schedule alternatives?
What-If Scenario Analysis
Critical Path Analysis
Earned Value Analysis
Resource Optimization
Show Answer
✅ Correct Answer: What-If Scenario Analysis
37. What is the primary purpose of a Milestone List?
Track significant schedule points
Document activity durations
Show resource assignments
Calculate float
Show Answer
✅ Correct Answer: Track significant schedule points
38. Which technique helps identify schedule risks?
Schedule Risk Analysis
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Schedule Risk Analysis
39. What is the purpose of a Schedule Model?
Mathematical representation of the schedule
Track actual progress
Document resource costs
Show stakeholder requirements
Show Answer
✅ Correct Answer: Mathematical representation of the schedule
40. Which technique combines cost and schedule analysis?
Earned Value Management
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Earned Value Management
41. What is the primary purpose of Leads and Lags?
Define timing relationships between activities
Compress the schedule
Level resources
Calculate float
Show Answer
✅ Correct Answer: Define timing relationships between activities
42. Which document contains approved schedule changes?
Schedule Baseline Updates
Project Charter
WBS Dictionary
Risk Register
Show Answer
✅ Correct Answer: Schedule Baseline Updates
43. What is the purpose of Schedule Variance (SV) in EVM?
Measure schedule performance
Track resource usage
Calculate activity duration
Identify critical path
Show Answer
✅ Correct Answer: Measure schedule performance
44. Which technique helps optimize resource utilization?
Resource Smoothing
Fast Tracking
Crashing
Critical Path Method
Show Answer
✅ Correct Answer: Resource Smoothing
45. What is the purpose of a Schedule Performance Report?
Communicate schedule status
Update activity durations
Reassign resources
Modify project scope
Show Answer
✅ Correct Answer: Communicate schedule status
46. Which technique uses probabilistic duration estimates?
PERT Analysis
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: PERT Analysis
47. What is the purpose of a Schedule Management Plan?
Define scheduling approach and tools
List all project activities
Show resource assignments
Document project risks
Show Answer
✅ Correct Answer: Define scheduling approach and tools
48. Which technique helps manage uncertainty in durations?
Three-Point Estimating
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Three-Point Estimating
49. What is the purpose of a Schedule Baseline?
Approved reference for comparison
Initial rough estimate
Resource allocation plan
Risk management tool
Show Answer
✅ Correct Answer: Approved reference for comparison
50. Which technique performs parallel activities?
Fast Tracking
Crashing
Resource Leveling
Critical Chain
Show Answer
✅ Correct Answer: Fast Tracking
51. What is the purpose of a Schedule Network Analysis?
Calculate critical path and float
Assign resources
Estimate costs
Identify stakeholders
Show Answer
✅ Correct Answer: Calculate critical path and float
52. Which document defines activity attributes?
Activity List
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Activity List
53. What is the purpose of a Schedule Compression?
Shorten project duration
Improve resource utilization
Reduce project costs
Enhance quality
Show Answer
✅ Correct Answer: Shorten project duration
54. Which technique identifies mandatory dependencies?
Dependency Determination
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Dependency Determination
55. What is the purpose of a Schedule Forecast?
Predict future schedule performance
Document past performance
Assign resources
Update WBS
Show Answer
✅ Correct Answer: Predict future schedule performance
56. Which technique uses most likely, optimistic, pessimistic estimates?
Three-Point Estimating
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Three-Point Estimating
57. What is the purpose of a Milestone Schedule?
Show major deliverables and dates
Detail all activities
Assign resources
Track costs
Show Answer
✅ Correct Answer: Show major deliverables and dates
58. Which technique analyzes schedule alternatives?
What-If Scenario Analysis
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: What-If Scenario Analysis
59. What is the purpose of a Schedule Model Maintenance?
Keep schedule current and accurate
Create initial schedule
Develop WBS
Identify stakeholders
Show Answer
✅ Correct Answer: Keep schedule current and accurate
60. Which technique uses buffers to protect project completion?
Critical Chain Method
Critical Path Method
Fast Tracking
Crashing
Show Answer
✅ Correct Answer: Critical Chain Method
61. What is the purpose of a Schedule Data Analysis?
Evaluate schedule health
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Evaluate schedule health
62. Which document records schedule performance?
Performance Reports
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Performance Reports
63. What is the purpose of a Schedule Change Control?
Manage modifications to schedule baseline
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Manage modifications to schedule baseline
64. Which technique identifies external dependencies?
Dependency Determination
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Dependency Determination
65. What is the purpose of a Schedule Optimization?
Improve schedule efficiency
Create initial schedule
Develop WBS
Identify stakeholders
Show Answer
✅ Correct Answer: Improve schedule efficiency
66. Which technique uses statistical analysis of durations?
Monte Carlo Simulation
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Monte Carlo Simulation
67. What is the purpose of a Schedule Impact Analysis?
Assess effect of changes
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Assess effect of changes
68. Which document defines schedule reporting formats?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
69. What is the purpose of a Schedule Comparison?
Analyze variances between schedules
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Analyze variances between schedules
70. Which technique uses weighted average duration estimates?
PERT Analysis
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: PERT Analysis
71. What is the purpose of a Schedule Health Check?
Validate schedule logic and integrity
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Validate schedule logic and integrity
72. Which technique analyzes schedule constraints?
Constraint Analysis
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Constraint Analysis
73. What is the purpose of a Schedule Risk Assessment?
Identify potential schedule disruptions
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Identify potential schedule disruptions
74. Which document defines schedule change procedures?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
75. What is the purpose of a Schedule Benchmarking?
Compare with similar projects
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Compare with similar projects
76. Which technique uses buffer management?
Critical Chain Method
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Critical Chain Method
77. What is the purpose of a Schedule Validation?
Confirm schedule completeness
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Confirm schedule completeness
78. Which technique analyzes schedule performance trends?
Trend Analysis
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Trend Analysis
79. What is the purpose of a Schedule Reconciliation?
Align schedule with other project documents
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Align schedule with other project documents
80. Which technique uses probability-based scheduling?
Monte Carlo Simulation
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Monte Carlo Simulation
81. What is the purpose of a Schedule Quality Review?
Ensure schedule meets standards
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Ensure schedule meets standards
82. Which document defines schedule milestones?
Milestone List
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Milestone List
83. What is the purpose of a Schedule Simulation?
Model different schedule scenarios
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Model different schedule scenarios
84. Which technique uses probabilistic scheduling?
PERT Analysis
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: PERT Analysis
85. What is the purpose of a Schedule Documentation?
Record schedule basis and details
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Record schedule basis and details
86. Which technique analyzes schedule performance indexes?
Earned Value Analysis
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Earned Value Analysis
87. What is the purpose of a Schedule Variance Analysis?
Investigate schedule deviations
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Investigate schedule deviations
88. Which document defines schedule measurement criteria?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
89. What is the purpose of a Schedule Risk Reserve?
Account for uncertainty in durations
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Account for uncertainty in durations
90. Which technique uses parallel paths to compress schedule?
Fast Tracking
Crashing
Resource Leveling
Critical Chain
Show Answer
✅ Correct Answer: Fast Tracking
91. What is the purpose of a Schedule Baseline Approval?
Formally authorize the schedule
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Formally authorize the schedule
92. Which technique uses additional resources to compress schedule?
Crashing
Fast Tracking
Resource Leveling
Critical Chain
Show Answer
✅ Correct Answer: Crashing
93. What is the purpose of a Schedule Performance Measurement?
Quantify schedule progress
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Quantify schedule progress
94. Which document defines schedule reporting frequency?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
95. What is the purpose of a Schedule Trend Analysis?
Identify performance patterns
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Identify performance patterns
96. Which technique uses buffers to protect critical chain?
Critical Chain Method
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Critical Chain Method
97. What is the purpose of a Schedule Compliance Review?
Ensure adherence to scheduling standards
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Ensure adherence to scheduling standards
98. Which technique analyzes schedule performance data?
Earned Value Analysis
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Earned Value Analysis
99. What is the purpose of a Schedule Risk Management?
Address uncertainties in schedule
Create initial schedule
Assign resources
Identify stakeholders
Show Answer
✅ Correct Answer: Address uncertainties in schedule
100. Which document records schedule assumptions?
Schedule Basis Documentation
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Basis Documentation
101. What is the purpose of a Schedule Optimization Technique?
Improve schedule efficiency
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Improve schedule efficiency
102. Which technique uses probabilistic analysis of schedules?
Monte Carlo Simulation
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Monte Carlo Simulation
103. What is the purpose of a Schedule Control Process?
Manage schedule changes
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Manage schedule changes
104. Which document defines schedule update procedures?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
105. What is the purpose of a Schedule Performance Baseline?
Approved reference for measurement
Initial rough estimate
Resource allocation plan
Risk management tool
Show Answer
✅ Correct Answer: Approved reference for measurement
106. Which technique uses statistical methods for durations?
PERT Analysis
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: PERT Analysis
107. What is the purpose of a Schedule Data Analysis?
Evaluate schedule information
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Evaluate schedule information
108. Which technique identifies discretionary dependencies?
Dependency Determination
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Dependency Determination
109. What is the purpose of a Schedule Reporting?
Communicate schedule status
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Communicate schedule status
110. Which technique uses weighted average estimates?
Three-Point Estimating
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Three-Point Estimating
111. What is the purpose of a Schedule Change Management?
Control modifications to schedule
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Control modifications to schedule
112. Which document defines schedule performance metrics?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
113. What is the purpose of a Schedule Risk Analysis?
Identify potential schedule threats
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Identify potential schedule threats
114. Which technique uses buffer management?
Critical Chain Method
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Critical Chain Method
115. What is the purpose of a Schedule Validation Review?
Confirm schedule accuracy
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Confirm schedule accuracy
116. Which technique analyzes schedule performance trends?
Trend Analysis
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Trend Analysis
117. What is the purpose of a Schedule Reconciliation?
Align schedule with project documents
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Align schedule with project documents
118. Which technique uses probability-based scheduling?
Monte Carlo Simulation
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Monte Carlo Simulation
119. What is the purpose of a Schedule Quality Assessment?
Evaluate schedule standards compliance
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Evaluate schedule standards compliance
120. Which document defines schedule milestones?
Milestone List
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Milestone List
121. What is the purpose of a Schedule Simulation Analysis?
Model different schedule scenarios
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Model different schedule scenarios
122. Which technique uses probabilistic scheduling?
PERT Analysis
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: PERT Analysis
123. What is the purpose of a Schedule Documentation Review?
Verify schedule basis and details
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Verify schedule basis and details
124. Which technique analyzes schedule performance indexes?
Earned Value Analysis
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Earned Value Analysis
125. What is the purpose of a Schedule Variance Analysis?
Investigate schedule deviations
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Investigate schedule deviations
126. Which document defines schedule measurement criteria?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
127. What is the purpose of a Schedule Risk Reserve Analysis?
Account for duration uncertainty
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Account for duration uncertainty
128. Which technique uses parallel paths to compress schedule?
Fast Tracking
Crashing
Resource Leveling
Critical Chain
Show Answer
✅ Correct Answer: Fast Tracking
129. What is the purpose of a Schedule Baseline Approval Process?
Formally authorize the schedule
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Formally authorize the schedule
130. Which technique uses additional resources to compress schedule?
Crashing
Fast Tracking
Resource Leveling
Critical Chain
Show Answer
✅ Correct Answer: Crashing
131. What is the purpose of a Schedule Performance Measurement System?
Quantify schedule progress
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Quantify schedule progress
132. Which document defines schedule reporting frequency?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
133. What is the purpose of a Schedule Trend Analysis Process?
Identify performance patterns
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Identify performance patterns
134. Which technique uses buffers to protect critical chain?
Critical Chain Method
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Critical Chain Method
135. What is the purpose of a Schedule Compliance Review Process?
Ensure adherence to standards
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Ensure adherence to standards
136. Which technique analyzes schedule performance data?
Earned Value Analysis
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Earned Value Analysis
137. What is the purpose of a Schedule Risk Management Process?
Address schedule uncertainties
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Address schedule uncertainties
138. Which document records schedule assumptions?
Schedule Basis Documentation
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Basis Documentation
139. What is the purpose of a Schedule Optimization Process?
Improve schedule efficiency
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Improve schedule efficiency
140. Which technique uses probabilistic analysis of schedules?
Monte Carlo Simulation
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Monte Carlo Simulation
141. What is the purpose of a Schedule Control System?
Manage schedule changes
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Manage schedule changes
142. Which document defines schedule update procedures?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan
143. What is the purpose of a Schedule Performance Baseline Process?
Establish approved reference
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Establish approved reference
144. Which technique uses statistical methods for durations?
PERT Analysis
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: PERT Analysis
145. What is the purpose of a Schedule Data Analysis Process?
Evaluate schedule information
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Evaluate schedule information
146. Which technique identifies discretionary dependencies?
Dependency Determination
Critical Path Method
Resource Leveling
Schedule Compression
Show Answer
✅ Correct Answer: Dependency Determination
147. What is the purpose of a Schedule Reporting System?
Communicate schedule status
Create initial schedule
Assign resources
Identify risks
Show Answer
✅ Correct Answer: Communicate schedule status
148. Which technique uses weighted average estimates?
Three-Point Estimating
Critical Path Method
Resource Leveling
Fast Tracking
Show Answer
✅ Correct Answer: Three-Point Estimating
149. What is the purpose of a Schedule Change Control System?
Manage modifications to schedule
Create initial schedule
Assign resources
Develop WBS
Show Answer
✅ Correct Answer: Manage modifications to schedule
150. Which document defines schedule performance metrics?
Schedule Management Plan
Project Charter
WBS
Risk Register
Show Answer
✅ Correct Answer: Schedule Management Plan