Pmi Sp Pmi Scheduling Professional Practice Test Practice Test - Set 1

Test your knowledge with this Pmi Sp Pmi Scheduling Professional Practice Test mock exam. Get real-world IT questions and prepare for certification success.

PMI-SP: PMI Scheduling Professional Practice Test - Exam Information

Exam Information

Exam Code

Pmi Sp Pmi Scheduling Professional Practice Test

Exam Title

PMI-SP: PMI Scheduling Professional Practice Test

Vendor

PMI

Difficulty

Intermediate

Duration

3.5 Hours

Question Format

Multiple Choice

Last Updated

February 24, 2025

Validates scheduling and project timeline management skills.

Practice Test

Shop Best PMI-SP: PMI Scheduling Professional Practice Test Resources Worldwide Amazon

1. What tool is commonly used to develop a project schedule?

Gantt Chart
Risk Register
Stakeholder Analysis
Project Charter

2. What is the purpose of a Critical Path Method (CPM)?

Identify the longest sequence of dependent tasks
Track project costs
Assign project resources
Define project scope

3. Which technique is used to estimate activity durations?

Three-Point Estimating
Gantt Chart
Stakeholder Analysis
Risk Register

4. What is the purpose of a Milestone Chart?

Track key project milestones
Track project costs
Assign project resources
Define project scope

5. Which technique is used to compress a project schedule?

Crashing
Gantt Chart
Stakeholder Analysis
Risk Register

6. What is the purpose of a Schedule Baseline?

Track project progress against the original schedule
Track project costs
Assign project resources
Define project scope

7. Which technique is used to identify schedule dependencies?

Precedence Diagramming Method (PDM)
Gantt Chart
Stakeholder Analysis
Risk Register

8. What is the purpose of a Schedule Network Analysis?

Identify the critical path and schedule flexibility
Track project costs
Assign project resources
Define project scope

9. Which technique is used to allocate resources to project tasks?

Resource Leveling
Gantt Chart
Stakeholder Analysis
Risk Register

10. What is the purpose of a Schedule Performance Index (SPI)?

Measure schedule efficiency
Track project costs
Assign project resources
Define project scope

11. Which technique is used to identify schedule risks?

What-If Scenario Analysis
Gantt Chart
Stakeholder Analysis
Risk Register

12. What is the purpose of a Schedule Variance (SV)?

Measure the difference between planned and actual progress
Track project costs
Assign project resources
Define project scope

13. Which technique is used to optimize the project schedule?

Schedule Compression
Gantt Chart
Stakeholder Analysis
Risk Register

14. What is the purpose of a Schedule Management Plan?

Define how the project schedule will be managed
Track project costs
Assign project resources
Define project scope

15. Which technique is used to estimate activity resources?

Resource Breakdown Structure (RBS)
Gantt Chart
Stakeholder Analysis
Risk Register

16. What is the purpose of a Schedule Forecast?

Predict future schedule performance
Track project costs
Assign project resources
Define project scope

17. Which technique is used to identify schedule constraints?

Constraint Analysis
Gantt Chart
Stakeholder Analysis
Risk Register

18. What is the purpose of a Schedule Update?

Reflect changes in the project schedule
Track project costs
Assign project resources
Define project scope

19. Which technique is used to visualize project schedules?

Gantt Chart
Risk Register
Stakeholder Analysis
Project Charter

20. What is the purpose of a Schedule Baseline?

Track project progress against the original schedule
Track project costs
Assign project resources
Define project scope

21. What is the primary purpose of a Work Breakdown Structure (WBS) in scheduling?

Define scope baseline for scheduling
Track project costs
Identify stakeholders
Manage project risks

22. Which technique is used to calculate float in a schedule network?

Critical Path Method
Gantt Chart
Resource Leveling
Earned Value Analysis

23. What does Total Float represent in schedule management?

Maximum delay without affecting project end date
Total project duration
Sum of all activity durations
Critical path duration

24. Which relationship type is most common in Precedence Diagramming Method?

Finish-to-Start
Start-to-Start
Finish-to-Finish
Start-to-Finish

25. What is the purpose of a Schedule Network Diagram?

Visualize task dependencies and paths
Track resource allocation
Monitor project costs
Identify project risks

26. Which technique helps resolve resource overallocation?

Resource Leveling
Fast Tracking
Crashing
Critical Chain Method

27. What is the key benefit of using Monte Carlo simulation in scheduling?

Quantify schedule uncertainty
Reduce project duration
Eliminate critical path
Automate schedule updates

28. Which schedule compression technique adds more resources?

Crashing
Fast Tracking
Resource Smoothing
Critical Chain

29. What is the primary output of Define Activities process?

Activity List
Schedule Baseline
Milestone Chart
Project Calendar

30. Which technique is used to determine activity sequences?

Precedence Diagramming Method
Critical Path Method
Earned Value Management
Resource Leveling

31. What is the purpose of a Rolling Wave Planning?

Progressive elaboration of near-term work
Compress project schedule
Level resources
Calculate float

32. Which document defines working hours and holidays for scheduling?

Project Calendar
Schedule Baseline
WBS
Network Diagram

33. What is the key difference between Free Float and Total Float?

Free Float doesn't affect successor activities
Total Float is always zero
Free Float applies only to critical path
Total Float includes project buffer

34. Which technique uses buffers to protect the schedule?

Critical Chain Method
Critical Path Method
Fast Tracking
Resource Leveling

35. What is the purpose of a Schedule Data Review?

Validate schedule integrity
Compress schedule
Update WBS
Reassign resources

36. Which technique analyzes schedule alternatives?

What-If Scenario Analysis
Critical Path Analysis
Earned Value Analysis
Resource Optimization

37. What is the primary purpose of a Milestone List?

Track significant schedule points
Document activity durations
Show resource assignments
Calculate float

38. Which technique helps identify schedule risks?

Schedule Risk Analysis
Critical Path Method
Resource Leveling
Fast Tracking

39. What is the purpose of a Schedule Model?

Mathematical representation of the schedule
Track actual progress
Document resource costs
Show stakeholder requirements

40. Which technique combines cost and schedule analysis?

Earned Value Management
Critical Path Method
Resource Leveling
Schedule Compression

41. What is the primary purpose of Leads and Lags?

Define timing relationships between activities
Compress the schedule
Level resources
Calculate float

42. Which document contains approved schedule changes?

Schedule Baseline Updates
Project Charter
WBS Dictionary
Risk Register

43. What is the purpose of Schedule Variance (SV) in EVM?

Measure schedule performance
Track resource usage
Calculate activity duration
Identify critical path

44. Which technique helps optimize resource utilization?

Resource Smoothing
Fast Tracking
Crashing
Critical Path Method

45. What is the purpose of a Schedule Performance Report?

Communicate schedule status
Update activity durations
Reassign resources
Modify project scope

46. Which technique uses probabilistic duration estimates?

PERT Analysis
Critical Path Method
Resource Leveling
Schedule Compression

47. What is the purpose of a Schedule Management Plan?

Define scheduling approach and tools
List all project activities
Show resource assignments
Document project risks

48. Which technique helps manage uncertainty in durations?

Three-Point Estimating
Critical Path Method
Resource Leveling
Fast Tracking

49. What is the purpose of a Schedule Baseline?

Approved reference for comparison
Initial rough estimate
Resource allocation plan
Risk management tool

50. Which technique performs parallel activities?

Fast Tracking
Crashing
Resource Leveling
Critical Chain

51. What is the purpose of a Schedule Network Analysis?

Calculate critical path and float
Assign resources
Estimate costs
Identify stakeholders

52. Which document defines activity attributes?

Activity List
Project Charter
WBS
Risk Register

53. What is the purpose of a Schedule Compression?

Shorten project duration
Improve resource utilization
Reduce project costs
Enhance quality

54. Which technique identifies mandatory dependencies?

Dependency Determination
Critical Path Method
Resource Leveling
Schedule Compression

55. What is the purpose of a Schedule Forecast?

Predict future schedule performance
Document past performance
Assign resources
Update WBS

56. Which technique uses most likely, optimistic, pessimistic estimates?

Three-Point Estimating
Critical Path Method
Resource Leveling
Fast Tracking

57. What is the purpose of a Milestone Schedule?

Show major deliverables and dates
Detail all activities
Assign resources
Track costs

58. Which technique analyzes schedule alternatives?

What-If Scenario Analysis
Critical Path Method
Resource Leveling
Schedule Compression

59. What is the purpose of a Schedule Model Maintenance?

Keep schedule current and accurate
Create initial schedule
Develop WBS
Identify stakeholders

60. Which technique uses buffers to protect project completion?

Critical Chain Method
Critical Path Method
Fast Tracking
Crashing

61. What is the purpose of a Schedule Data Analysis?

Evaluate schedule health
Create initial schedule
Assign resources
Develop WBS

62. Which document records schedule performance?

Performance Reports
Project Charter
WBS
Risk Register

63. What is the purpose of a Schedule Change Control?

Manage modifications to schedule baseline
Create initial schedule
Assign resources
Identify risks

64. Which technique identifies external dependencies?

Dependency Determination
Critical Path Method
Resource Leveling
Schedule Compression

65. What is the purpose of a Schedule Optimization?

Improve schedule efficiency
Create initial schedule
Develop WBS
Identify stakeholders

66. Which technique uses statistical analysis of durations?

Monte Carlo Simulation
Critical Path Method
Resource Leveling
Fast Tracking

67. What is the purpose of a Schedule Impact Analysis?

Assess effect of changes
Create initial schedule
Assign resources
Develop WBS

68. Which document defines schedule reporting formats?

Schedule Management Plan
Project Charter
WBS
Risk Register

69. What is the purpose of a Schedule Comparison?

Analyze variances between schedules
Create initial schedule
Assign resources
Identify risks

70. Which technique uses weighted average duration estimates?

PERT Analysis
Critical Path Method
Resource Leveling
Schedule Compression

71. What is the purpose of a Schedule Health Check?

Validate schedule logic and integrity
Create initial schedule
Assign resources
Develop WBS

72. Which technique analyzes schedule constraints?

Constraint Analysis
Critical Path Method
Resource Leveling
Fast Tracking

73. What is the purpose of a Schedule Risk Assessment?

Identify potential schedule disruptions
Create initial schedule
Assign resources
Develop WBS

74. Which document defines schedule change procedures?

Schedule Management Plan
Project Charter
WBS
Risk Register

75. What is the purpose of a Schedule Benchmarking?

Compare with similar projects
Create initial schedule
Assign resources
Identify risks

76. Which technique uses buffer management?

Critical Chain Method
Critical Path Method
Resource Leveling
Schedule Compression

77. What is the purpose of a Schedule Validation?

Confirm schedule completeness
Create initial schedule
Assign resources
Develop WBS

78. Which technique analyzes schedule performance trends?

Trend Analysis
Critical Path Method
Resource Leveling
Fast Tracking

79. What is the purpose of a Schedule Reconciliation?

Align schedule with other project documents
Create initial schedule
Assign resources
Identify risks

80. Which technique uses probability-based scheduling?

Monte Carlo Simulation
Critical Path Method
Resource Leveling
Schedule Compression

81. What is the purpose of a Schedule Quality Review?

Ensure schedule meets standards
Create initial schedule
Assign resources
Develop WBS

82. Which document defines schedule milestones?

Milestone List
Project Charter
WBS
Risk Register

83. What is the purpose of a Schedule Simulation?

Model different schedule scenarios
Create initial schedule
Assign resources
Identify risks

84. Which technique uses probabilistic scheduling?

PERT Analysis
Critical Path Method
Resource Leveling
Fast Tracking

85. What is the purpose of a Schedule Documentation?

Record schedule basis and details
Create initial schedule
Assign resources
Develop WBS

86. Which technique analyzes schedule performance indexes?

Earned Value Analysis
Critical Path Method
Resource Leveling
Schedule Compression

87. What is the purpose of a Schedule Variance Analysis?

Investigate schedule deviations
Create initial schedule
Assign resources
Identify risks

88. Which document defines schedule measurement criteria?

Schedule Management Plan
Project Charter
WBS
Risk Register

89. What is the purpose of a Schedule Risk Reserve?

Account for uncertainty in durations
Create initial schedule
Assign resources
Develop WBS

90. Which technique uses parallel paths to compress schedule?

Fast Tracking
Crashing
Resource Leveling
Critical Chain

91. What is the purpose of a Schedule Baseline Approval?

Formally authorize the schedule
Create initial schedule
Assign resources
Identify risks

92. Which technique uses additional resources to compress schedule?

Crashing
Fast Tracking
Resource Leveling
Critical Chain

93. What is the purpose of a Schedule Performance Measurement?

Quantify schedule progress
Create initial schedule
Assign resources
Develop WBS

94. Which document defines schedule reporting frequency?

Schedule Management Plan
Project Charter
WBS
Risk Register

95. What is the purpose of a Schedule Trend Analysis?

Identify performance patterns
Create initial schedule
Assign resources
Identify risks

96. Which technique uses buffers to protect critical chain?

Critical Chain Method
Critical Path Method
Resource Leveling
Schedule Compression

97. What is the purpose of a Schedule Compliance Review?

Ensure adherence to scheduling standards
Create initial schedule
Assign resources
Develop WBS

98. Which technique analyzes schedule performance data?

Earned Value Analysis
Critical Path Method
Resource Leveling
Fast Tracking

99. What is the purpose of a Schedule Risk Management?

Address uncertainties in schedule
Create initial schedule
Assign resources
Identify stakeholders

100. Which document records schedule assumptions?

Schedule Basis Documentation
Project Charter
WBS
Risk Register

101. What is the purpose of a Schedule Optimization Technique?

Improve schedule efficiency
Create initial schedule
Assign resources
Develop WBS

102. Which technique uses probabilistic analysis of schedules?

Monte Carlo Simulation
Critical Path Method
Resource Leveling
Fast Tracking

103. What is the purpose of a Schedule Control Process?

Manage schedule changes
Create initial schedule
Assign resources
Identify risks

104. Which document defines schedule update procedures?

Schedule Management Plan
Project Charter
WBS
Risk Register

105. What is the purpose of a Schedule Performance Baseline?

Approved reference for measurement
Initial rough estimate
Resource allocation plan
Risk management tool

106. Which technique uses statistical methods for durations?

PERT Analysis
Critical Path Method
Resource Leveling
Schedule Compression

107. What is the purpose of a Schedule Data Analysis?

Evaluate schedule information
Create initial schedule
Assign resources
Develop WBS

108. Which technique identifies discretionary dependencies?

Dependency Determination
Critical Path Method
Resource Leveling
Schedule Compression

109. What is the purpose of a Schedule Reporting?

Communicate schedule status
Create initial schedule
Assign resources
Identify risks

110. Which technique uses weighted average estimates?

Three-Point Estimating
Critical Path Method
Resource Leveling
Fast Tracking

111. What is the purpose of a Schedule Change Management?

Control modifications to schedule
Create initial schedule
Assign resources
Develop WBS

112. Which document defines schedule performance metrics?

Schedule Management Plan
Project Charter
WBS
Risk Register

113. What is the purpose of a Schedule Risk Analysis?

Identify potential schedule threats
Create initial schedule
Assign resources
Develop WBS

114. Which technique uses buffer management?

Critical Chain Method
Critical Path Method
Resource Leveling
Schedule Compression

115. What is the purpose of a Schedule Validation Review?

Confirm schedule accuracy
Create initial schedule
Assign resources
Identify risks

116. Which technique analyzes schedule performance trends?

Trend Analysis
Critical Path Method
Resource Leveling
Fast Tracking

117. What is the purpose of a Schedule Reconciliation?

Align schedule with project documents
Create initial schedule
Assign resources
Develop WBS

118. Which technique uses probability-based scheduling?

Monte Carlo Simulation
Critical Path Method
Resource Leveling
Schedule Compression

119. What is the purpose of a Schedule Quality Assessment?

Evaluate schedule standards compliance
Create initial schedule
Assign resources
Identify risks

120. Which document defines schedule milestones?

Milestone List
Project Charter
WBS
Risk Register

121. What is the purpose of a Schedule Simulation Analysis?

Model different schedule scenarios
Create initial schedule
Assign resources
Develop WBS

122. Which technique uses probabilistic scheduling?

PERT Analysis
Critical Path Method
Resource Leveling
Fast Tracking

123. What is the purpose of a Schedule Documentation Review?

Verify schedule basis and details
Create initial schedule
Assign resources
Identify risks

124. Which technique analyzes schedule performance indexes?

Earned Value Analysis
Critical Path Method
Resource Leveling
Schedule Compression

125. What is the purpose of a Schedule Variance Analysis?

Investigate schedule deviations
Create initial schedule
Assign resources
Develop WBS

126. Which document defines schedule measurement criteria?

Schedule Management Plan
Project Charter
WBS
Risk Register

127. What is the purpose of a Schedule Risk Reserve Analysis?

Account for duration uncertainty
Create initial schedule
Assign resources
Identify risks

128. Which technique uses parallel paths to compress schedule?

Fast Tracking
Crashing
Resource Leveling
Critical Chain

129. What is the purpose of a Schedule Baseline Approval Process?

Formally authorize the schedule
Create initial schedule
Assign resources
Develop WBS

130. Which technique uses additional resources to compress schedule?

Crashing
Fast Tracking
Resource Leveling
Critical Chain

131. What is the purpose of a Schedule Performance Measurement System?

Quantify schedule progress
Create initial schedule
Assign resources
Identify risks

132. Which document defines schedule reporting frequency?

Schedule Management Plan
Project Charter
WBS
Risk Register

133. What is the purpose of a Schedule Trend Analysis Process?

Identify performance patterns
Create initial schedule
Assign resources
Develop WBS

134. Which technique uses buffers to protect critical chain?

Critical Chain Method
Critical Path Method
Resource Leveling
Schedule Compression

135. What is the purpose of a Schedule Compliance Review Process?

Ensure adherence to standards
Create initial schedule
Assign resources
Identify risks

136. Which technique analyzes schedule performance data?

Earned Value Analysis
Critical Path Method
Resource Leveling
Fast Tracking

137. What is the purpose of a Schedule Risk Management Process?

Address schedule uncertainties
Create initial schedule
Assign resources
Develop WBS

138. Which document records schedule assumptions?

Schedule Basis Documentation
Project Charter
WBS
Risk Register

139. What is the purpose of a Schedule Optimization Process?

Improve schedule efficiency
Create initial schedule
Assign resources
Identify risks

140. Which technique uses probabilistic analysis of schedules?

Monte Carlo Simulation
Critical Path Method
Resource Leveling
Fast Tracking

141. What is the purpose of a Schedule Control System?

Manage schedule changes
Create initial schedule
Assign resources
Develop WBS

142. Which document defines schedule update procedures?

Schedule Management Plan
Project Charter
WBS
Risk Register

143. What is the purpose of a Schedule Performance Baseline Process?

Establish approved reference
Create initial schedule
Assign resources
Identify risks

144. Which technique uses statistical methods for durations?

PERT Analysis
Critical Path Method
Resource Leveling
Schedule Compression

145. What is the purpose of a Schedule Data Analysis Process?

Evaluate schedule information
Create initial schedule
Assign resources
Develop WBS

146. Which technique identifies discretionary dependencies?

Dependency Determination
Critical Path Method
Resource Leveling
Schedule Compression

147. What is the purpose of a Schedule Reporting System?

Communicate schedule status
Create initial schedule
Assign resources
Identify risks

148. Which technique uses weighted average estimates?

Three-Point Estimating
Critical Path Method
Resource Leveling
Fast Tracking

149. What is the purpose of a Schedule Change Control System?

Manage modifications to schedule
Create initial schedule
Assign resources
Develop WBS

150. Which document defines schedule performance metrics?

Schedule Management Plan
Project Charter
WBS
Risk Register

The Pmi Sp Pmi Scheduling Professional Practice Test certification is a globally recognized credential for IT professionals. This practice test helps you prepare by covering key topics like hardware, networking, troubleshooting, and security.