1. What is a key characteristic of program management?
Managing interrelated projects
Focusing on individual project tasks
Minimizing project scope
Executing projects independently
Show Answer
✅ Correct Answer: Managing interrelated projects
2. Which document defines the program management strategy?
Program Management Plan
Project Charter
Risk Register
Stakeholder Register
Show Answer
✅ Correct Answer: Program Management Plan
3. What is the purpose of a Program Governance Framework?
Define decision-making processes for program management
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Define decision-making processes for program management
4. Which technique is used to prioritize program components?
Weighted Scoring Model
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Weighted Scoring Model
5. What is the purpose of a Program Performance Report?
Track the performance of program components
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Track the performance of program components
6. Which technique is used to balance program components?
Program Balancing
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Program Balancing
7. What is the purpose of a Program Roadmap?
Visualize the timeline of program components
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Visualize the timeline of program components
8. Which technique is used to assess program risks?
Program Risk Assessment
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Program Risk Assessment
9. What is the purpose of a Program Charter?
Formally authorize the program
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Formally authorize the program
10. Which technique is used to optimize program value?
Program Optimization
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Program Optimization
11. What is the purpose of a Program Governance Board?
Make decisions on program components
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Make decisions on program components
12. Which technique is used to align program components with strategic objectives?
Strategic Alignment
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Strategic Alignment
13. What is the purpose of a Program Dashboard?
Provide a visual summary of program performance
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Provide a visual summary of program performance
14. Which technique is used to evaluate program performance?
Key Performance Indicators (KPIs)
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Key Performance Indicators (KPIs)
15. What is the purpose of a Program Risk Management Plan?
Define how program risks will be managed
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Define how program risks will be managed
16. Which technique is used to prioritize program investments?
Investment Prioritization
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Investment Prioritization
17. What is the purpose of a Program Communication Plan?
Define how program information will be shared
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Define how program information will be shared
18. Which technique is used to assess program value?
Value Assessment
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Value Assessment
19. What is the purpose of a Program Review?
Evaluate the performance of program components
Track project costs
Assign project resources
Define project scope
Show Answer
✅ Correct Answer: Evaluate the performance of program components
20. Which technique is used to manage program resources?
Resource Allocation
Gantt Chart
Stakeholder Analysis
Risk Register
Show Answer
✅ Correct Answer: Resource Allocation
21. What is the primary purpose of program benefits management?
Ensure delivery of planned benefits
Reduce project durations
Minimize stakeholder involvement
Standardize project methodologies
Show Answer
✅ Correct Answer: Ensure delivery of planned benefits
22. Which document defines the program governance structure?
Program Governance Plan
Program Charter
Program Management Plan
Program Roadmap
Show Answer
✅ Correct Answer: Program Governance Plan
23. What is the key benefit of program stakeholder engagement?
Alignment of stakeholder expectations
Reduced documentation requirements
Elimination of all risks
Faster individual project execution
Show Answer
✅ Correct Answer: Alignment of stakeholder expectations
24. Which technique is used to assess program component interdependencies?
Dependency Mapping
Critical Path Method
Earned Value Analysis
SWOT Analysis
Show Answer
✅ Correct Answer: Dependency Mapping
25. What is the main output of the Define Program process?
Program Charter
Program Management Plan
Program Roadmap
Program Benefits Register
Show Answer
✅ Correct Answer: Program Charter
26. Which program management function ensures strategic alignment?
Benefits Realization
Governance
Stakeholder Management
Risk Management
Show Answer
✅ Correct Answer: Benefits Realization
27. What is the primary purpose of program risk management?
Identify and address cross-project risks
Eliminate all project risks
Standardize risk registers
Reduce risk management documentation
Show Answer
✅ Correct Answer: Identify and address cross-project risks
28. Which document tracks program-level issues?
Program Issue Register
Program Charter
Program Management Plan
Program Roadmap
Show Answer
✅ Correct Answer: Program Issue Register
29. What is the key benefit of program resource optimization?
Efficient use of shared resources
Reduced need for specialized skills
Elimination of resource constraints
Standardized resource templates
Show Answer
✅ Correct Answer: Efficient use of shared resources
30. Which technique is used to assess program component health?
Component Health Assessment
Earned Value Management
Critical Path Method
PERT Analysis
Show Answer
✅ Correct Answer: Component Health Assessment
31. What is the primary purpose of program performance reporting?
Communicate overall program status
Replace project status reports
Reduce documentation requirements
Eliminate variance analysis
Show Answer
✅ Correct Answer: Communicate overall program status
32. Which document guides program component selection?
Program Management Plan
Program Charter
Program Roadmap
Program Benefits Register
Show Answer
✅ Correct Answer: Program Management Plan
33. What is the key output of the Manage Program Benefits process?
Benefits Realization Report
Program Management Plan
Program Roadmap
Program Risk Register
Show Answer
✅ Correct Answer: Benefits Realization Report
34. Which technique helps visualize program component timelines?
Program Roadmap
Gantt Chart
PERT Chart
Network Diagram
Show Answer
✅ Correct Answer: Program Roadmap
35. What is the primary purpose of program governance?
Ensure effective decision-making
Reduce project durations
Eliminate risks
Standardize methodologies
Show Answer
✅ Correct Answer: Ensure effective decision-making
36. Which program management process monitors benefits realization?
Benefits Management
Governance
Stakeholder Management
Risk Management
Show Answer
✅ Correct Answer: Benefits Management
37. What is the key benefit of program communication management?
Consistent messaging across projects
Reduced documentation
Faster project execution
Elimination of conflicts
Show Answer
✅ Correct Answer: Consistent messaging across projects
38. Which technique is used to evaluate program financial performance?
Return on Investment (ROI) Analysis
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Return on Investment (ROI) Analysis
39. What is the primary purpose of program component authorization?
Formally approve component initiation
Reduce documentation
Eliminate risks
Standardize methodologies
Show Answer
✅ Correct Answer: Formally approve component initiation
40. Which document tracks program-level risks?
Program Risk Register
Program Management Plan
Program Charter
Program Roadmap
Show Answer
✅ Correct Answer: Program Risk Register
41. What is the key output of the Optimize Program Resources process?
Resource Allocation Plan
Program Management Plan
Program Roadmap
Program Benefits Register
Show Answer
✅ Correct Answer: Resource Allocation Plan
42. Which technique helps assess program strategic alignment?
Strategic Contribution Analysis
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Strategic Contribution Analysis
43. What is the primary purpose of program performance management?
Ensure components deliver expected benefits
Reduce project durations
Eliminate budget variances
Standardize methodologies
Show Answer
✅ Correct Answer: Ensure components deliver expected benefits
44. Which program management process handles component changes?
Program Change Management
Governance
Benefits Management
Stakeholder Management
Show Answer
✅ Correct Answer: Program Change Management
45. What is the key benefit of program strategic alignment?
Components support organizational objectives
Reduced management overhead
Faster project execution
Elimination of risks
Show Answer
✅ Correct Answer: Components support organizational objectives
46. Which technique is used to prioritize program components?
Multi-Criteria Decision Analysis
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Multi-Criteria Decision Analysis
47. What is the primary purpose of program governance reviews?
Assess program health and performance
Reduce documentation
Eliminate risks
Standardize methodologies
Show Answer
✅ Correct Answer: Assess program health and performance
48. Which document defines program reporting requirements?
Program Communication Plan
Program Management Plan
Program Charter
Program Roadmap
Show Answer
✅ Correct Answer: Program Communication Plan
49. What is the key output of the Manage Program Risks process?
Risk Response Plans
Program Management Plan
Program Roadmap
Program Benefits Register
Show Answer
✅ Correct Answer: Risk Response Plans
50. Which technique helps visualize program resource allocation?
Resource Heat Map
Gantt Chart
PERT Chart
Network Diagram
Show Answer
✅ Correct Answer: Resource Heat Map
51. What is the primary purpose of program component transition?
Move deliverables to operations
Reduce documentation
Eliminate risks
Standardize methodologies
Show Answer
✅ Correct Answer: Move deliverables to operations
52. Which program management process ensures benefits realization?
Benefits Management
Governance
Stakeholder Management
Risk Management
Show Answer
✅ Correct Answer: Benefits Management
53. What is the key benefit of program optimization?
Maximized value within constraints
Reduced management overhead
Faster project execution
Elimination of all risks
Show Answer
✅ Correct Answer: Maximized value within constraints
54. Which technique is used to assess program component value?
Business Case Analysis
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Business Case Analysis
55. What is the primary purpose of program stakeholder management?
Engage stakeholders in program decisions
Reduce documentation
Eliminate risks
Standardize methodologies
Show Answer
✅ Correct Answer: Engage stakeholders in program decisions
56. Which document records program-level changes?
Program Change Log
Program Management Plan
Program Charter
Program Roadmap
Show Answer
✅ Correct Answer: Program Change Log
57. What is the key output of the Authorize Program Components process?
Component Authorization Documents
Program Management Plan
Program Roadmap
Program Benefits Register
Show Answer
✅ Correct Answer: Component Authorization Documents
58. Which technique helps analyze program financial metrics?
Net Present Value (NPV) Analysis
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Net Present Value (NPV) Analysis
59. What is the primary purpose of program capacity planning?
Ensure adequate resources for components
Reduce project durations
Eliminate budget variances
Standardize methodologies
Show Answer
✅ Correct Answer: Ensure adequate resources for components
60. Which program management process handles stakeholder communications?
Communication Management
Governance
Benefits Management
Risk Management
Show Answer
✅ Correct Answer: Communication Management
61. What is the key benefit of program performance reporting?
Informed decision-making
Reduced documentation
Faster project execution
Elimination of risks
Show Answer
✅ Correct Answer: Informed decision-making
62. Which technique is used to evaluate program component interdependencies?
Dependency Analysis
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Dependency Analysis
63. What is the primary purpose of program component prioritization?
Allocate resources to highest-value components
Reduce documentation
Eliminate risks
Standardize methodologies
Show Answer
✅ Correct Answer: Allocate resources to highest-value components
64. Which document defines program risk thresholds?
Program Risk Management Plan
Program Management Plan
Program Charter
Program Roadmap
Show Answer
✅ Correct Answer: Program Risk Management Plan
65. What is the key output of the Develop Program Management Plan process?
Program Management Plan
Program Charter
Program Roadmap
Program Benefits Register
Show Answer
✅ Correct Answer: Program Management Plan
66. Which technique helps visualize program strategic alignment?
Strategic Alignment Matrix
Gantt Chart
PERT Chart
Network Diagram
Show Answer
✅ Correct Answer: Strategic Alignment Matrix
67. What is the primary purpose of program value measurement?
Quantify component contributions
Reduce project durations
Eliminate budget variances
Standardize methodologies
Show Answer
✅ Correct Answer: Quantify component contributions
68. Which program management process handles component transitions?
Transition Management
Governance
Benefits Management
Risk Management
Show Answer
✅ Correct Answer: Transition Management
69. What is the key benefit of program governance frameworks?
Consistent decision-making processes
Reduced management overhead
Faster project execution
Elimination of risks
Show Answer
✅ Correct Answer: Consistent decision-making processes
70. Which technique is used to assess program component performance?
Balanced Scorecard
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Balanced Scorecard
71. What is the primary purpose of program resource management?
Optimize allocation across components
Reduce documentation
Eliminate risks
Standardize methodologies
Show Answer
✅ Correct Answer: Optimize allocation across components
72. Which document records program-level decisions?
Program Governance Minutes
Program Management Plan
Program Charter
Program Roadmap
Show Answer
✅ Correct Answer: Program Governance Minutes
73. What is the key output of the Manage Program Performance process?
Program Performance Report
Program Management Plan
Program Roadmap
Program Risk Register
Show Answer
✅ Correct Answer: Program Performance Report
74. Which technique helps analyze program component mix?
Bubble Chart Analysis
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Bubble Chart Analysis
75. What is the primary purpose of program risk assessment?
Identify threats and opportunities
Reduce project durations
Eliminate all risks
Standardize methodologies
Show Answer
✅ Correct Answer: Identify threats and opportunities
76. Which program management process handles component benefits realization?
Benefits Management
Governance
Stakeholder Management
Risk Management
Show Answer
✅ Correct Answer: Benefits Management
77. What is the key benefit of program communication plans?
Stakeholder awareness and engagement
Reduced documentation
Faster project execution
Elimination of conflicts
Show Answer
✅ Correct Answer: Stakeholder awareness and engagement
78. Which technique is used to evaluate program financial health?
Financial Ratio Analysis
Critical Path Method
Earned Value Analysis
PERT Analysis
Show Answer
✅ Correct Answer: Financial Ratio Analysis
79. What is the primary purpose of program component categorization?
Group by strategic contribution
Reduce management complexity
Eliminate underperforming projects
Standardize reporting
Show Answer
✅ Correct Answer: Group by strategic contribution
80. Which document defines program performance metrics?
Program Performance Management Plan
Program Management Plan
Program Charter
Program Roadmap
Show Answer
✅ Correct Answer: Program Performance Management Plan
81. What is the key output of the Manage Program Communications process?
Program Performance Reports
Program Management Plan
Program Roadmap
Program Risk Register
Show Answer
✅ Correct Answer: Program Performance Reports
82. Which technique helps visualize program risk exposure?
Risk Heat Map
Gantt Chart
PERT Chart
Network Diagram
Show Answer
✅ Correct Answer: Risk Heat Map
83. What is the primary purpose of program governance committees?
Make strategic program decisions
Reduce documentation
Eliminate risks
Standardize methodologies
Show Answer
✅ Correct Answer: Make strategic program decisions
84. Which program management process ensures component alignment?
Strategic Alignment
Governance
Benefits Management
Risk Management
Show Answer
✅ Correct Answer: Strategic Alignment
85. What is the primary purpose of a Program Benefits Register?
Track expected benefits and their realization
List all program stakeholders
Document project risks
Define program governance structure
Show Answer
✅ Correct Answer: Track expected benefits and their realization
86. Which process ensures that program components are aligned with strategic objectives?
Strategic Program Alignment
Program Governance
Benefits Realization
Stakeholder Engagement
Show Answer
✅ Correct Answer: Strategic Program Alignment
87. What is the key output of the Monitor Program Benefits process?
Benefits Realization Report
Program Dashboard
Risk Assessment Report
Stakeholder Register
Show Answer
✅ Correct Answer: Benefits Realization Report
88. Which technique is used to assess the strategic contribution of program components?
Strategic Alignment Matrix
Earned Value Analysis
Critical Path Method
SWOT Analysis
Show Answer
✅ Correct Answer: Strategic Alignment Matrix
89. What is the primary purpose of a Program Governance Board?
Provide oversight and decision-making
Manage day-to-day project tasks
Track individual project budgets
Develop risk response plans
Show Answer
✅ Correct Answer: Provide oversight and decision-making
90. Which document defines how program benefits will be measured and tracked?
Benefits Management Plan
Program Charter
Risk Management Plan
Communication Plan
Show Answer
✅ Correct Answer: Benefits Management Plan
91. What is the key benefit of program-level risk management?
Proactively addresses cross-project risks
Eliminates all risks
Reduces project budgets
Standardizes risk templates
Show Answer
✅ Correct Answer: Proactively addresses cross-project risks
92. Which technique helps visualize program interdependencies?
Dependency Mapping
Gantt Chart
PERT Chart
Work Breakdown Structure
Show Answer
✅ Correct Answer: Dependency Mapping
93. What is the primary purpose of a Program Roadmap?
Provide a high-level timeline of program components
Track detailed project schedules
Document risk responses
List stakeholder roles
Show Answer
✅ Correct Answer: Provide a high-level timeline of program components
94. Which process ensures that program resources are optimally allocated?
Resource Optimization
Stakeholder Engagement
Benefits Realization
Risk Management
Show Answer
✅ Correct Answer: Resource Optimization
95. What is the key output of the Manage Program Stakeholders process?
Stakeholder Engagement Plan
Program Charter
Risk Register
Benefits Register
Show Answer
✅ Correct Answer: Stakeholder Engagement Plan
96. Which technique is used to evaluate program financial performance?
Earned Value Management (EVM)
Critical Path Analysis
SWOT Analysis
Stakeholder Mapping
Show Answer
✅ Correct Answer: Earned Value Management (EVM)
97. What is the primary purpose of a Program Management Office (PMO)?
Support program governance and execution
Manage individual project tasks
Replace the program manager
Eliminate program risks
Show Answer
✅ Correct Answer: Support program governance and execution
98. Which document defines how program changes will be managed?
Change Management Plan
Program Charter
Risk Management Plan
Benefits Register
Show Answer
✅ Correct Answer: Change Management Plan
99. What is the key benefit of program-level communication management?
Ensures consistent messaging across projects
Reduces project budgets
Eliminates stakeholder conflicts
Standardizes project schedules
Show Answer
✅ Correct Answer: Ensures consistent messaging across projects
100. Which technique is used to prioritize program investments?
Cost-Benefit Analysis
Critical Path Method
Stakeholder Analysis
Risk Assessment
Show Answer
✅ Correct Answer: Cost-Benefit Analysis
101. What is the primary purpose of program transition management?
Ensure smooth handover of deliverables to operations
Close individual projects early
Reduce program documentation
Eliminate all risks
Show Answer
✅ Correct Answer: Ensure smooth handover of deliverables to operations
102. Which document records program-level risks and responses?
Program Risk Register
Program Charter
Benefits Register
Stakeholder Register
Show Answer
✅ Correct Answer: Program Risk Register
103. What is the key output of the Manage Program Issues process?
Issue Resolution Report
Program Dashboard
Risk Assessment
Benefits Report
Show Answer
✅ Correct Answer: Issue Resolution Report
104. Which technique helps assess program stakeholder influence?
Power/Interest Grid
Earned Value Analysis
Critical Path Method
SWOT Analysis
Show Answer
✅ Correct Answer: Power/Interest Grid
105. What is the primary purpose of a Program Performance Dashboard?
Provide real-time program status visibility
Replace project status reports
Track individual project tasks
Document risk responses
Show Answer
✅ Correct Answer: Provide real-time program status visibility
106. Which process ensures that program benefits are sustained after closure?
Benefits Sustainment
Program Governance
Stakeholder Engagement
Risk Management
Show Answer
✅ Correct Answer: Benefits Sustainment
107. What is the key benefit of program-level quality management?
Ensures consistent standards across projects
Reduces program budgets
Eliminates all defects
Standardizes risk responses
Show Answer
✅ Correct Answer: Ensures consistent standards across projects
108. Which technique is used to evaluate program component viability?
Feasibility Study
Critical Path Analysis
Stakeholder Analysis
Risk Assessment
Show Answer
✅ Correct Answer: Feasibility Study
109. What is the primary purpose of program financial management?
Optimize resource allocation across projects
Reduce stakeholder involvement
Eliminate budget variances
Standardize risk registers
Show Answer
✅ Correct Answer: Optimize resource allocation across projects
110. Which document defines program-level quality standards?
Quality Management Plan
Program Charter
Risk Management Plan
Benefits Register
Show Answer
✅ Correct Answer: Quality Management Plan
111. What is the key output of the Close Program process?
Program Closure Report
Program Dashboard
Risk Assessment
Benefits Report
Show Answer
✅ Correct Answer: Program Closure Report
112. Which technique helps assess program component alignment with business goals?
Strategic Contribution Analysis
Earned Value Analysis
Critical Path Method
SWOT Analysis
Show Answer
✅ Correct Answer: Strategic Contribution Analysis
113. What is the primary purpose of program stakeholder analysis?
Identify and prioritize key stakeholders
Reduce program budgets
Eliminate risks
Standardize project schedules
Show Answer
✅ Correct Answer: Identify and prioritize key stakeholders
114. Which document records program-level lessons learned?
Lessons Learned Register
Program Charter
Risk Register
Benefits Register
Show Answer
✅ Correct Answer: Lessons Learned Register
115. What is the key benefit of program-level procurement management?
Ensures cost-effective vendor contracts
Eliminates procurement risks
Reduces stakeholder involvement
Standardizes project methodologies
Show Answer
✅ Correct Answer: Ensures cost-effective vendor contracts
116. Which technique is used to assess program schedule performance?
Schedule Variance Analysis
Stakeholder Mapping
Risk Assessment
SWOT Analysis
Show Answer
✅ Correct Answer: Schedule Variance Analysis
117. What is the primary purpose of program configuration management?
Maintain consistency of program deliverables
Reduce program budgets
Eliminate risks
Standardize stakeholder communications
Show Answer
✅ Correct Answer: Maintain consistency of program deliverables
118. Which document defines program-level escalation procedures?
Governance Plan
Program Charter
Risk Management Plan
Communication Plan
Show Answer
✅ Correct Answer: Governance Plan
119. What is the key output of the Manage Program Risks process?
Risk Response Plans
Program Dashboard
Benefits Report
Stakeholder Register
Show Answer
✅ Correct Answer: Risk Response Plans
120. Which technique helps visualize program financial health?
Financial Dashboard
Gantt Chart
PERT Chart
Network Diagram
Show Answer
✅ Correct Answer: Financial Dashboard
121. What is the primary purpose of program issue management?
Resolve cross-project conflicts and blockers
Reduce program budgets
Eliminate stakeholder involvement
Standardize risk responses
Show Answer
✅ Correct Answer: Resolve cross-project conflicts and blockers
122. Which document defines program-level success criteria?
Program Charter
Risk Management Plan
Benefits Register
Stakeholder Register
Show Answer
✅ Correct Answer: Program Charter
123. What is the key benefit of program-level integration management?
Ensures coordinated execution across projects
Reduces program duration
Eliminates all risks
Standardizes project methodologies
Show Answer
✅ Correct Answer: Ensures coordinated execution across projects
124. Which technique is used to assess program stakeholder engagement?
Stakeholder Satisfaction Surveys
Earned Value Analysis
Critical Path Method
SWOT Analysis
Show Answer
✅ Correct Answer: Stakeholder Satisfaction Surveys
125. What is the primary purpose of program scope management?
Define and control program boundaries
Reduce program budgets
Eliminate risks
Standardize stakeholder communications
Show Answer
✅ Correct Answer: Define and control program boundaries
126. Which document tracks program-level assumptions and constraints?
Program Assumptions Log
Risk Register
Benefits Register
Stakeholder Register
Show Answer
✅ Correct Answer: Program Assumptions Log
127. What is the key output of the Monitor and Control Program process?
Program Performance Reports
Program Charter
Risk Register
Benefits Register
Show Answer
✅ Correct Answer: Program Performance Reports
128. Which technique helps assess program value realization?
Benefits Realization Review
Critical Path Analysis
Stakeholder Analysis
Risk Assessment
Show Answer
✅ Correct Answer: Benefits Realization Review
129. What is the primary purpose of program schedule management?
Ensure timely delivery of program components
Reduce program budgets
Eliminate risks
Standardize stakeholder communications
Show Answer
✅ Correct Answer: Ensure timely delivery of program components
130. Which document defines program-level roles and responsibilities?
Governance Plan
Program Charter
Risk Management Plan
Communication Plan
Show Answer
✅ Correct Answer: Governance Plan
131. What is the key benefit of program-level change control?
Minimizes disruptions to program objectives
Reduces program duration
Eliminates all risks
Standardizes project methodologies
Show Answer
✅ Correct Answer: Minimizes disruptions to program objectives
132. Which technique is used to assess program resource utilization?
Resource Utilization Reports
Earned Value Analysis
Critical Path Method
SWOT Analysis
Show Answer
✅ Correct Answer: Resource Utilization Reports
133. What is the primary purpose of program cost management?
Control and optimize program expenditures
Reduce stakeholder involvement
Eliminate risks
Standardize project schedules
Show Answer
✅ Correct Answer: Control and optimize program expenditures
134. Which document records program-level decisions and approvals?
Governance Meeting Minutes
Program Charter
Risk Register
Benefits Register
Show Answer
✅ Correct Answer: Governance Meeting Minutes
135. What is the key output of the Manage Program Stakeholders process?
Stakeholder Engagement Assessment
Program Dashboard
Risk Assessment
Benefits Report
Show Answer
✅ Correct Answer: Stakeholder Engagement Assessment
136. Which technique helps assess program risk exposure?
Risk Heat Map
Gantt Chart
PERT Chart
Network Diagram
Show Answer
✅ Correct Answer: Risk Heat Map
137. What is the primary purpose of program procurement management?
Secure necessary goods and services for the program
Reduce program budgets
Eliminate risks
Standardize stakeholder communications
Show Answer
✅ Correct Answer: Secure necessary goods and services for the program
138. Which document defines program-level communication protocols?
Communication Management Plan
Program Charter
Risk Management Plan
Benefits Register
Show Answer
✅ Correct Answer: Communication Management Plan
139. What is the key benefit of program-level performance monitoring?
Ensures alignment with strategic objectives
Reduces program duration
Eliminates all risks
Standardizes project methodologies
Show Answer
✅ Correct Answer: Ensures alignment with strategic objectives
140. Which technique is used to assess program stakeholder influence?
Power/Interest Grid
Earned Value Analysis
Critical Path Method
SWOT Analysis
Show Answer
✅ Correct Answer: Power/Interest Grid